Phase 2 – Northern Basin

HEC-HMS Model Development for Various Tributaries below the Red River of the North at Halstad, MN

Datasets available on this site contain spatial data generated from terrain analysis performed on LiDAR data, HEC-HMS models, and a summary report for the Phase 2 project.  Datasets for this project have been broken down into 18 subwatersheds. Click the “Subwatershed  Map” below to determine the appropriate subwatershed dataset to download.  Datasets for each subwatershed are downloadable as a zip file. Each zip file contains GIS data, HEC-HMS models, and documents for the subwatershed.  Also available below is the Final Report for the Phase 2 project.

Although the information contained in these files has been produced and processed from sources believed to be reliable, no warranty, expressed or implied, is made regarding accuracy, adequacy, completeness, legality, reliability or usefulness of any information.  The developing firms shall not be held liable for any improper or incorrect use of the information described and/or contained herein and assumes no responsibility for anyone’s use of the information.

Subwatershed Map

Data Download links:

Final Report (797 MB)

Forest River Watershed (1.9 GB)
U.S. Army Corps of Engineers, Rock Island District
Goose River Watershed (10.1 GB)
HDR Engineering, Inc.
Grand Marais River Watershed (4.7 GB)
HDR Engineering, Inc.
Joe River Watershed (2.1 GB)
HDR Engineering, Inc.
Joe River Watershed - Revised data (Jan 2014) (0.3 GB)
HDR Engineering, Inc.
Local Area Drains (4.4 GB)
HDR Engineering, Inc.
Red Lake River – Clearwater River Watershed (10.8 GB)
HDR Engineering, Inc.
Red Lake River – Lower Red Lake River Watershed (14 GB)
HDR Engineering, Inc.
Red Lake River – Thief River Watershed (10.5 GB)
HDR Engineering, Inc.
Red Lake River – Upper Red Lake River Watershed (12.4 GB)
HDR Engineering, Inc.
Roseau River Watershed (12 GB)
HDR Engineering, Inc.
Sandhill River Watershed (7.8 GB)
HDR Engineering, Inc.
Snake River Watershed (10.8 GB)
HDR Engineering, Inc.
Tamarac River Watershed (9.6 GB)
HDR Engineering, Inc.
Turtle River Watershed (2 GB)
U.S. Army Corps of Engineers, Rock Island District
Two Rivers Watershed (6.9 GB)
HDR Engineering, Inc.
Two Rivers Watershed - Revised Data (Jan 2014) (1.3 GB)
HDR Engineering, Inc.
Wilson Creek Watershed & ND Coulees (5 GB)
HDR Engineering, Inc.

Disclaimer: File sizes are large and may require significant time to download.

Park River Watershed and Pembina River Watershed
Hydrologic modeling and calibration is underway for the Park and Pembina River watersheds. These models are anticipated to be completed in early 2014, and will be posted after the Technical Advisory Committee review has been completed and comments resolved.